In order to ensure the normal operation of the aluminum profile drawing machine and prolong its service life, the following maintenance work needs to be carried out regularly:
Check the moving parts of the machine: make sure the screws are tightened to prevent loosening and causing failure.
Check the hydraulic oil and oil pipe: keep the hydraulic oil clean and the oil level of the level gauge correct; Check that the tubing connection is good and there is no leakage.
Inspect the slide and wire rope: make sure there are no foreign objects or loose welds on the slide; Check whether the wire rope is loose or badly worn.
Check the braking system: make sure the braking performance is good and reliable to prevent accidents during the towing process.
Check the motor and gearbox: regularly check the cooling fan, sound and temperature of the motor; When the reducer is working, the lubricating oil should be filled regularly, and the sound should be checked to see if it is normal.
Power testing machine: Before each start-up, the power testing machine should check whether the speed, tension, tension and other parameters are set correctly.
